Robert Bird Group (RBG) was the main temporary works consultant for the contractor erecting the main steel roof (Central Processor Roof) at Abu Dhabi’s new airport, Midfield Terminal with a built up area of 700,000 sqm. The capacity of Midfield Terminal Building is expected to be 40 million passengers per annum.

The extent of RBG’s  role with the Midfield Terminal Project was from tender support through to construction support. RBG performed an erection stress analysis of the main central processor roof  which included more than 200 analysis stages and also designed all necessary  temporary works in the roof members did not become overstressed during  the construction phase.

RBG also designed all temporary works which supported the Central Process Roof, including steel temporary towers,  spreader beams and jacking frames.