Haikou Meilan Airport

B+H scope of services included developing a master plan and design of the terminal building. The development included a terminal and administrative building with built up area of 89,000 sqm with 21 gates and 5 remote boarding positions and an air traffic control tower.

Criteria for the site and master planning included: site and shape constraints; runway configuration; aircraft maneuvering; efficient use of apron space; expansion capability; the integration of a through highway; and facility operation. The final scheme consisted of one processor building for ease of operation, with three piers which could allow for incremental expansion.


Country
China

Service
Aviation, Master Planning, Architecture